IDOT Work on US 24

The Illinois Department of Transportation (IDOT) announces that work is underway on US 24 near Cameron Lane.

 The project includes replacement of the bridge carrying US 24 over Lamarsh Creek, construction of a right turn lane to Cameron Ln. and construction of a left turn lane to Wheeler Rd.

Lane closures will be in effect in each direction while median crossovers are constructed. Traffic will remain one lane in each direction during the first stage, with southbound traffic being shifted across the median onto the northbound side. Stage 2 is scheduled to begin this summer. The project is scheduled to be completed by early November.

Motorists should be alert for flaggers and expect delays in this area while the project is underway.

Please slow down and use extreme caution while driving through all work zones.

Comments

Popular posts from this blog

Illinois Chamber, Government Affairs Report

Local High School to Win a SMART Board in 5th Annual Recycle Your Style Contest