Illinois 40 work zone traffic patterns to change April 8
EAST
PEORIA
— The Illinois Department of Transportation announces that traffic patterns in
the Illinois 40 bridge repair work zone will change Monday, April 8.
This
work is on the following three structures:
- Illinois 40 over Camp Street and Farm Creek
- Illinois 40 over Washington Street
- Washington Street over Farm Creek
The
Washington Street bridge just south of River Road will be reduced to one lane
in each direction; the southbound Washington Street ramp to Interstate 74 will
be closed with a detour posted; and Camp Street under Illinois 40 will be
reduced to one lane in each direction.
Motorists
can expect delays and should allow extra time for trips through this area. To
avoid the work area, when feasible, use of alternate routes should be
considered. Drivers are urged to pay close attention to changed conditions and
signs in the work zones, obey the posted speed limits, refrain from using
mobile devices and be alert for workers and equipment.
For
IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area
construction details on IDOT’s traveler
information map on GettingAroundIllinois.com.
Comments
Post a Comment