Work on Illinois 29 in Creve Coeur begins May 6
The Illinois Department of Transportation announces that construction on
Illinois 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur
will begin the week of May 6.
The
work involves resurfacing, drainage and lighting improvements, and curb and
gutter replacement. Lane closures will be required during the project, which is
expected to be complete in May 2020.
Motorists
can expect delays and should allow extra time for trips through this area. To
avoid the work area, when feasible, use of alternate routes should be
considered. Drivers are urged to pay close attention to changed conditions and
signs in the work zones, obey the posted speed limits, refrain from using mobile
devices and be alert for workers and equipment.
Comments
Post a Comment