Resurfacing of U.S. 24 begins April 30

The Illinois Department of Transportation announced today that paving work will begin Monday, April 30, on U.S. 24 from Pfeiffer Road in Bartonville to Illinois 9 and on Illinois 9 to a quarter mile east of U.S. 24.

To complete the work, lane closures will be required in both directions of U.S. 24 and Illinois 9, beginning with the closure of the right lanes of U.S. 24. The project involves resurfacing U.S. 24 and Illinois 9, constructing a new sidewalk at the Pfeiffer Road intersection and traffic signal work on U.S. 24. Access to homes and businesses will be maintained during the project, which is expected to be completed in August, weather permitting.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area construction details on IDOT’s traveler information map on www.GettingAroundPeoria.com.

Comments

Popular posts from this blog

Local High School to Win a SMART Board in 5th Annual Recycle Your Style Contest

Methodist Offers Free Informational Heart Program

Yesterday's Says Goodbye to the Past: Welcoming the Next Generation of Schramm | Pekin Restaurant Week 2023